Upon receiving the Terra Dotta contract, Terra Dotta will provision two sites: an administrative site and a public registration site (for travelers). Once created, an implementation planning meeting will be held between the Assistant Director for Services at Terra Dotta and the functional office. The meeting will provide the functional office with an understanding of the overall project from start to finish. Resources for how to prepare for the project, in addition to "next steps" will be provided. Before the implementation project officially begins, there will be two integration preparation meetings between Terra Dotta, the functional office, and the client's IT group.
Project Timeline & Preparation
The Terra Dotta implementation project will consist of six different phases. Each phase is for a concentrated amount of time and in all, the project will span a total of 8 weeks.
- Phase 1: Planning (2 weeks)
- 2 to 4, 1-hour planning meetings with Terra Dotta Project Manager to review:
- Travel policies and procedures
- Desired workflows for approvals
- Administrative access
- Setting preferences
- 2 to 4, 1-hour planning meetings with Terra Dotta Project Manager to review:
- Phase 2: Integration (3 weeks):
- Configure email forwarding
- Configure personalized URL, campus login, and data transfer from SIS/HR databases
- Phase 3: Training and Building (2 weeks)
- Terra Dotta Project Manager builds registration forms and workflows
- Terra Dotta Project Manager configures AlertTraveler®
- Daily check-in meetings to:
- Review developed content
- Answer any outstanding questions
- Conduct Training
- Review process for managing a critical situation with AlertTraveler®
- Phase 4: Validation (2 weeks)
- Office Staff:
- Submit test travel registrations, review administrative process
- Test authentication/logging in
- Verify SIS/HR data is pulling correctly for test users
- Review forms, content, workflows, approval process, settings, and access points
- Registrants/end-users:
- Submit test travel registrations, including required forms
- Test authentication/logging in
- Terra Dotta Project Manager:
- Edit/revise configurations as needed
- Answer any outstanding questions
- Office Staff:
- Phase 5: Launch (2 weeks)
- Conduct 2 pre-launch meetings with Terra Dotta Project Manager
- Begin accepting registrations
- Conduct 2 post-launch meetings with Terra Dotta Project Manager
- Phase 6: Maintain (ongoing)
- Client site administrators:
- Use and administer Terra Dotta site independently
- Build additional forms/content or configure additional features as desired
- Utilize Terra Dotta support for help
- Client site administrators:
A successful implementation requires not only active participation from the functional office, but also organized resources that can be provided to the Terra Dotta Project Manager. This could include, but is not limited to:
- Links or electronic files of the existing travel approval process.
- Access to existing requirements and workflows.
- List of needs, requirements, or goals that you want Terra Dotta to address (ex: a special report, ability to collect a specific piece of information).
Who's involved with the implementation
Institution Roles Responsibilities:
- Project Champion:
- Senior level person with a strong interest in the success of the project
- Liaison with other campus departments as needed
- Primary Admin:
- Day-to-day owner of the project from "functional" (client) department
- Will be able to request maintenance permissions for functional office members
- Should have a moderate level of technology skills
- Can be the same person as the project champion
- Technical Lead:
- IT leader responsible for facilitating data integration, secure campus login, DNS changes, and other technical requirements
Terra Dotta Roles and Responsibilities:
- Project Manager:
- Serves as primary liaison with client during implementation period
- Coordinates online meetings/calls between the Terra Dotta team and client team
- Provides direct support through case system and checkpoint meetings
- Configures Terra Dotta to meet client’s business needs, leveraging best practices
- Manages the project, driving all participants to meet milestones and maintain the schedule
- Works with client’s IT team on the technical integration between Terra Dotta and the SIS, including the Single Sign On configuration
- Account Manager:
- Ensures information covered during initial contract discussions are conveyed to implementation team
- Facilitates discussions if any additional services are requested
- Assistant Director, Services:
- Periodically corresponds to check on progress and overall status/satisfaction of implementation